PDA

View Full Version : Hydro Ness Now Fully Operational



NewsBot
03-Jun-22, 20:12
The Caithness Business Index (http://www.caithness-business.co.uk) has posted the following article:

Hydro Ness Now Fully Operational



https://caithness-business.co.uk/image_cache/na16957_tn.jpg
The Hydro Ness, a hydroelectric generator on the banks of the River Ness, is now fully operational. Hydro Ness is a 92kW Archimedes screw hydroelectric scheme and interactive visitor experience which will generate over 500,000 kWh of renewable energy each year. [Read Full Article (https://caithness-business.co.uk/article/16957)]