21st Century Technology.

The cause of the “Power Cut” that recently left hundreds of thousands of people stranded underground on the tube, closed down many mainline train stations and left much of the capital blacked out, has been found.

Investigators said that it was caused by an engineer installing a one amp fuse instead of a five amp fuse.

The outage cost Londoners tens of thousands of pounds.

The fuse cost a few pounds.

Ps… Electrical Engineer seeks new position

Ciao,

Dave the Rave